-
Thailand Power Development Plan 2015-2036 (PDP2015)
In 2012, the Ministry of Energy (Thailand) together with the Electricity Generating Authority of Thailand (EGAT) prepared the Thailand Power Development Plan 2012-2030 (PDP2010 Revision 3) to formulate power system development framework. The PDP2010 Revision 3 was endorsed by the National Energy Policy Council (NEPC) on June 8, 2012 and acknowledged by the Cabinet on June 19, 2012.
Additional Information
Field | Value |
---|---|
Last updated | 20 មេសា 2019 |
Created | 20 មេសា 2019 |
ទម្រង់ | |
អាជ្ញាប័ណ្ណ | CC-BY-SA-3.0-IGO |
ឈ្មោះ | Thailand Power Development Plan 2015-2036 (PDP2015) |
ការពិពណ៌នា |
In 2012, the Ministry of Energy (Thailand) together with the Electricity Generating Authority of Thailand (EGAT) prepared the Thailand Power Development Plan 2012-2030 (PDP2010 Revision 3) to formulate power system development framework. The PDP2010 Revision 3 was endorsed by the National Energy Policy Council (NEPC) on June 8, 2012 and acknowledged by the Cabinet on June 19, 2012. |
ភាសារបស់ធនធាន |
|