As per EIA Procedures (2015), this ESIA report for Tigyit coal-fired power plant (120 MW) to identify and evaluate the potential impacts from the operation of the power plant. The project is an existing one and located in Tigyit Village Tract, Pinlaung Township, Pa Oh Self-Administration Region, Southern Shan State. The project proponent, Wuxi Hua Guang (Myanmar) Co., Ltd., is a sole subsidiary of the former famous boiler manufacturer, Wuxi Hua Guang Boiler Co., Ltd. in Shanghai, China. The total land area of power plant is 45.05 hectares.

ធនធានទិន្នន័យ (2)

មើល​ធនធានទិន្នន័យ - ESIA of Tigyit Coal Fired Power Plant_pg 1 to 411

Additional Info

Field Value
តំបន់ភូមិសាស្រ្ត (ការលាតសន្ធឹងក្នុងលំហ)
  • មីយ៉ាន់ម៉ា
ប្រធានបទ
  • Environmental impact assessments
  • Non-renewable energy production
ប្រភេទឯកសារ Environmental Impact Assessment
ភាគីនៃកិច្ចព្រមព្រៀង
  • Wuxi Hua Guang (Myanmar) Ltd.
អង្គភាពរដ្ឋាភិបាល (ច្រើន)
  • Ministry of Natural Resources and Environmental Conservation
របៀបបង្ហាញព័ត៌មាន ចេញផ្សាយដោយរដ្ឋាភិបាល
អាជ្ញាប័ណ្ណ

No license given

សិទ្ធិ No
កំហិតនៃការចូល និងប្រើប្រាស់

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

កំណែ/បោះពុម្ពលើកទី 1
ភាសារបស់ឯកសារ
  • ភាសាអង់គ្លេស
  • ភាសា​ភូមា
ខេត្ត (ច្រើន)
  • Shan
តំណភ្ជាប់ទៅនឹងប្រភព https://www.mediafire.com/folder/s6k89sv3ybfi2/Environmental_Impact_Assessment_(EIA)_Report_for_Thi_gyit_(Tigyit)_Coal-fired_Power_Plant, http://www.ecd.gov.mm/?q=policy
កាតព្វកិច្ចរបស់ភាគីនៅក្នុងការអនុវត្តគម្រោង

Wu Xi Hua Guan Co., Ltd. has the obligation to ensure that the people and the natural environment are adequately protected from the negative impacts generated from the project and they adequately and rightfully benefit from the positive impact.

សង្ខេបមូលនិធិបរិស្ថាន

The company will reserve USD 74,000 annual for Environmental Monitoring Plan in the operation phase.