SN Power_ESIA of Middle Yeywa Hydropower Project

បោះពុម្ពផ្សាយដោយ៖ Open Development Myanmar

This Environmental and Social Impact Assessment Report (ESIA) is prepared by a combined team of international and national experts on behalf of SN Power, for the Middle Yeywa Hydropower Project on the Myitnge (Nam Tu) River located in Shan State. The baseline data survey is done from 2015 to 2018 and the EIA is intended to meet the requirements of Myanmar EIA Procedures (2015) and Environmental Compliance Certificate (ECC) under the Ministry of Natural Resources and Environmental Conservation (MONREC).

ធនធានទិន្នន័យ (2)

មើល​ធនធានទិន្នន័យ - ESIA_Middle Yeywa Hydropwer Project

Additional Info

Field Value
តំបន់ភូមិសាស្រ្ត (ការលាតសន្ធឹងក្នុងលំហ)
  • មីយ៉ាន់ម៉ា
ប្រធានបទ
  • Environmental impact assessments
  • Hydropower dams
ប្រភេទឯកសារ Environmental Impact Assessment
ភាគីនៃកិច្ចព្រមព្រៀង
  • SN Power Invest Netherlands B.V.
អង្គភាពរដ្ឋាភិបាល (ច្រើន)
  • Ministry of Electricity and Energy
  • Ministry of Natural Resources and Environmental Conservation
ឈ្មោះសម្បទាន/អាជ្ញាប័ណ្ណ ESIA for Middle Yeywa Hydropower Project
របៀបបង្ហាញព័ត៌មាន ចេញផ្សាយដោយរដ្ឋាភិបាល
អាជ្ញាប័ណ្ណ

No license given

សិទ្ធិ No
កំហិតនៃការចូល និងប្រើប្រាស់

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm or damage suffered as a result of its use.

កំណែ/បោះពុម្ពលើកទី 1
ភាសារបស់ឯកសារ
  • ភាសាអង់គ្លេស
  • ភាសា​ភូមា
ខេត្ត (ច្រើន)
  • Shan
តំណភ្ជាប់ទៅនឹងប្រភព http://www.ecd.gov.mm/sites/default/files/Law%20PDF/Middle%20Yeywa%20EIA%20report.pdf
កាតព្វកិច្ចរបស់ភាគីនៅក្នុងការអនុវត្តគម្រោង

In relation to the requirements from international funders and national environmental authorities, SN Power will have the overall responsibility for implementing and coordinating all social and environmental mitigation activities and programs.

កាតព្វកិច្ចការពារបរិស្ថាន

Environmental and Social Unit (ESU) of the company will implement preventative measures to protect the environment by carrying out environmental monitoring and supervision during the project phases in cooperation with the contractors.

សង្ខេបមូលនិធិបរិស្ថាន

The total estimated cost for implementing environmental and social management plans is 13,261,450 USD for pre-construction (1 year) and construction (6 years).