Skip to content

Lower Sesan II hydropower project

The Lower Sesan 2 (LS2) hydropower project​ has installed capacity of 400MW, with a height of 75 meters and length of 6 kilometers. It will be implemented in Sesan district, Stung Treng province. Despite the environmental impact assessment (EIA) falling to meet international best practice, Cambodia's cabinet approved the project in late 2012. With the total estimated cost of US$ 781 million, most of which was allegedly reported from China's bank loans, the project is running under 40-years "built-operate-transfer"(BOT) concessional contract.

Data Resources (1)

Data Resource Preview - Lower Sesan II hydropower project

Additional Info

Field Value
Document type Reports, journal articles, and research papers (including theses and dissertations)
Language of document
  • English
Geographic area (spatial range)
  • Cambodia
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1.0
License CC-BY-SA-4.0
Contact

Mekong Watch Address: 3F AOKI Bldg. 1-12-11 Taito, Taito-ku, Tokyo 110-0016, Japan Contact: Tel: +81 3 3832 5034, Fax: +81 3 3832 5039 Website: http://www.mekongwatch.org/english/index.html E-mail: info@mekongwatch.org

Author (corporate) Mekong Watch
Publication place Tokyo
Publisher Mekong Watch
Publication date 2015
Pagination 1
Legacy reference document Mekong_watch_lower_sesan2_16.02.2015.pdf
Date uploaded February 26, 2016, 03:42 (UTC)
Date modified July 22, 2024, 03:09 (UTC)