Cambodia: Greater Mekong Subregion Transmission Project

This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This project was estimated to cost $95.0 million, and ADB was to provide a loan for the equivalent $44.3 million from its Special Funds resources to finance 46% of the project cost. At the project completion, the cost cam to $76.0 million, of which ADB financed $38.9 million, or about 51%. The constructions actually commenced in January 2007 and were completed in November 2011.

Data Resources (1)

Data Resource Preview - Cambodia: Greater Mekong Subregion Transmission Project

Additional Info

Field Value
Document type Reports, journal articles, and research papers (including theses and dissertations)
Language of document
  • Khmer
Topics Energy
Geographic area (spatial range)
  • Cambodia
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1.0
License CC-BY-SA-4.0
Contact

Cambodia Resident Mission No. 29 Suramarit Blvd. (268/19) Sangkat Chaktomuk, Khan Daun Penh, Phnom Penh, Cambodia

Phone: + 855 23 215 805, 215 806, 216 417 Fax: + 855 23 215 807

Author (corporate) Asian Development Bank
Publisher Asian Development Bank
Publication date 2012
Legacy reference document ADB_Cambodia_Greater_Mekong_Subregion_Transmission__2012.pdf