Regulations on general conditions for connecting solar PV generation sources to the electricity supply system of national grid or to the electrical system of a consumer connected to the electricity supply of national grid
Published by: Open Development Cambodia
Data Resources (1)
Data Resource Preview - Regulations on general conditions for connecting solar PV generation sources
Additional Info
Field | Value |
---|---|
Geographic area (spatial range) |
|
Document reference # | 018.18 |
Issuing agency/parties |
|
Implementing agencies |
|
Language |
|
Formal type of document | Law |
Alternative/short title | Regulations on general conditions for connecting solar PV generation sources |
Topics |
|
License |
No license given |
Copyright | To be determined |
Access and use constraints |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm or damage suffered as a result of its use. |
Status | Signed and in effect |
Adoption date/Enacted/Promulgation date/Signing date | January 26, 2018 |
Effective/Enforced Date | January 26, 2018 |
Publication reference | Electricity Authority of Cambodia |
Links to source | https://eac.gov.kh/site/viewfile?param=legal_doc%2Fkhmer%2Fregulation%2Fregulation-general-conditions-for-connecting-SolarPV-kh.pdf |
Contact |
Electricity Authority of Cambodia Address: 02, Road 282, Sangkat Boeng Keng Kang 1, Khan Boeng Keng Kang, Phnom Penh, Cambodia. Tel: (855) 23 217 654 / (855) 23 987 898 Fax: (855) 23 214 144 |
Legacy reference document | Regulations_on_general_conditions_for_connecting_solar_PV_generation_sources__26.01.2018.pdf |
Keywords | electricity,Solar PV,National grid |
Date uploaded | September 10, 2021, 05:05 (UTC) |
Date modified | September 10, 2021, 05:08 (UTC) |