[Draft] Environmental Impact Assessment: Cambodia Block A Development
Published by: Open Development Cambodia
Data Resources (6)
Data Resource Preview - Environmental Impact Assessment: Cambodia Block A Development (Part 1)
Additional Info
Field | Value |
---|---|
Geographic area (spatial range) |
|
Topics |
|
Document type | Environmental Impact Assessment |
Contracting Parties |
|
Government Entity (multiple) |
|
Disclosure Mode | Released by local non-governmental organizations (LNGOs) |
License | CC-BY-SA-4.0 |
Copyright | To be determined |
Access and use constraints |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use. |
Version / Edition | 1 |
Language of document |
|
Province(s) |
|
Metadata Reference Information |
Metadata last updated on 2018-05-03. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia. |
Contact |
International Environmental Management Co. Ldt. (IEM) Address: Bangkok (Head Office) 8th Floor, Sitthivorakit Building, 5 Soi Pipat, Silom Road, Bangrak, Bangkok 10500, Thailand. Tel: (66-2) 636.6390-9, 636.6683-4, Fax: (66-2) 236-6276, E-mail: ron@iem-global.com |
Granted area | 470900.0 |
Land use planning | Year 0, Platform A Installation, Drilling and Hook up and commissioning service (HUC); Year 3, Installation, Drilling and HUC B; Year 4, Installation, Drilling and HUC C; Year 4, Installation, Drilling and HUC D; Year 5, Installation, Drilling and HUC E; Year 5, Installation, Drilling and HUC F; Year 6, Installation, Drilling and HUC G; Year 7, Installation, Drilling and HUC H; Year 8, Installation, Drilling and HUC I; Year 9, Installation, Drilling and HUC J3 |
Land use planning unit | Ha |
Job creation summary |
Core operations require 50 people during phase 1 a. Approximately 30 people total will be needed to run the ship and 20 people total to run the facilities. Additional personnel may be required for Phase 1 c. Where appropriate, the use of local business firms and employees will be a priority for Chevron and partners. |
Number of created jobs | 50.0 |
Environmental protection obligation |
Environmental monitoring measures will be taken to verify the effectiveness of mitigation measure on various aspects such as seawater and sediment, fishing, tourism, air quality, rare and endangered species, greenhouse gas emission, under water noise, drill cutting and mud, waste generation, and benthos. |
Related Project |
Oil and Gas Block A: https://opendevelopmentcambodia.net/en/profiles/oil-and-gas-blocks/?feature_id=27 |
Legacy reference document | Draft_EIA_report_Cheveron__00.03.2012.pdf |
Open Contracting Identifier | ocds-miumsd-b77e2ed5-64c3-4fd9-a706-76c8a82792ba |
Date uploaded | November 1, 2018, 02:35 (UTC) |
Date modified | September 27, 2021, 04:34 (UTC) |