<record><leader>01043nam a0000157ua 124 </leader><controlfield tag="001">1621_1</controlfield><controlfield tag="008">130321 2009                             </controlfield><datafield ind1=" " ind2=" " tag="110"><subfield code="a">NGO Forum on Cambodia</subfield></datafield><datafield ind1=" " ind2=" " tag="245"><subfield code="a">Lower Sesan 2 Hydro Project EIA Review</subfield></datafield><datafield ind1=" " ind2=" " tag="260"><subfield code="b">NGO Forum on Cambodia</subfield><subfield code="a">Cambodia</subfield><subfield code="c">2009</subfield></datafield><datafield ind1=" " ind2=" " tag="300"><subfield code="a">18 p</subfield></datafield><datafield ind1=" " ind2=" " tag="520"><subfield code="a">The purpose of this review is to provide comments on the adequacy of the EIA for decision making by the Ministry of Environment (MoE) as well as the Electricity Authority of Cambodia (EAC), Ministry of Industry, Mines and Energy (MIME), and Ministry of Economics and Finance (MEF), and Ministry of Water Resources and Meteorology (MoWRAM) the lead agencies responsible for EIA standards and approval, project licensing, project oversight, project performance, and overall compliance with Cambodian law.</subfield></datafield><datafield ind1=" " ind2=" " tag="546"><subfield code="a">English and Khmer</subfield></datafield><datafield ind1=" " ind2=" " tag="653"><subfield code="a">Lower Sesan</subfield><subfield code="a">001</subfield></datafield><datafield ind1=" " ind2=" " tag="856"><subfield code="u">CatalogueRecords/SeSan2_EIAComments_August 2009 NGOF.pdf</subfield><subfield code="y">Download English PDF</subfield></datafield><datafield ind1=" " ind2=" " tag="856"><subfield code="u">CatalogueRecords/SeSan2_EIAComments_August 2009 NGOF KH.pdf</subfield><subfield code="y">Download Khmer PDF</subfield></datafield></record>