{"fields": [{"001": "1621_1"}, {"008": "130321 2009                             "}, {"110": {"ind1": " ", "subfields": [{"a": "NGO Forum on Cambodia"}], "ind2": " "}}, {"245": {"ind1": " ", "subfields": [{"a": "Lower Sesan 2 Hydro Project EIA Review"}], "ind2": " "}}, {"260": {"ind1": " ", "subfields": [{"b": "NGO Forum on Cambodia"}, {"a": "Cambodia"}, {"c": "2009"}], "ind2": " "}}, {"300": {"ind1": " ", "subfields": [{"a": "18 p"}], "ind2": " "}}, {"520": {"ind1": " ", "subfields": [{"a": "The purpose of this review is to provide comments on the adequacy of the EIA for decision making by the Ministry of Environment (MoE) as well as the Electricity Authority of Cambodia (EAC), Ministry of Industry, Mines and Energy (MIME), and Ministry of Economics and Finance (MEF), and Ministry of Water Resources and Meteorology (MoWRAM) the lead agencies responsible for EIA standards and approval, project licensing, project oversight, project performance, and overall compliance with Cambodian law."}], "ind2": " "}}, {"546": {"ind1": " ", "subfields": [{"a": "English and Khmer"}], "ind2": " "}}, {"653": {"ind1": " ", "subfields": [{"a": "Lower Sesan"}, {"a": "001"}], "ind2": " "}}, {"856": {"ind1": " ", "subfields": [{"u": "CatalogueRecords/SeSan2_EIAComments_August 2009 NGOF.pdf"}, {"y": "Download English PDF"}], "ind2": " "}}, {"856": {"ind1": " ", "subfields": [{"u": "CatalogueRecords/SeSan2_EIAComments_August 2009 NGOF KH.pdf"}, {"y": "Download Khmer PDF"}], "ind2": " "}}], "leader": "01043nam a0000157ua 124 "}