-
EMP for Pre-construction of Terminals of Mon Petrol Co., Ltd.
The quality measurement of the physical environment is done in September 2019.
Additional Information
Field | Value |
---|---|
Last updated | 11 ធ្នូ 2019 |
Created | 11 ធ្នូ 2019 |
ទម្រង់ | |
អាជ្ញាប័ណ្ណ | License not specified |
ឈ្មោះ | EMP for Pre-construction of Terminals of Mon Petrol Co., Ltd. |
ភាសារបស់ធនធាន |
|
ការពិពណ៌នា | The quality measurement of the physical environment is done in September 2019. |