Progress of Cambodia Power Development Plans & Transmission Interconnection Projects
This presentation is prepared by Electricité du Cambodge (EDC). It focused on Current Development of Power Sector and Outlook of Power Development Plan.
-
Hydro dams under construction or approved for development (2009)
A brief table summary of the power sector in Cambodia, specifically highlights the hydro dams under construction or approved for development as of September 2009. The table outl...
-
Cambodia: Greater Mekong Subregion Transmission Project
This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This p...
-
List of_EIAs on September 2013
This is a list of record on the Environmental Impact Assessment (EIA) received by a local organization in Cambodia, NGO Forum, as of September 2013. The table consists of 71 EIA...
-
Stung Atay Hydropower Plan
Stung Atay Hydropower Plan, located in Western Cambodia on the Atay River, worth US$255 million and undertaken by China Datang Cooperation. The dam has been a work-in-progress s...
-
Lower Stung Russei Chrum Hydropower Plant Inaugurated
The Chinese-built Lower Stung Russei Chrum Hydropower dam located in Bak Klong commune of Koh Kong province, in the Southwestern part of Cambodia has begun operation. The constr...
-
120 MW plant in Cambodia to start operation this week
Atai plant sited in Pursat, Western Cambodia, invested by the China Datang Corporation worth 255 million USD under a concessional contract of 34 years “Build-Operate-Transfer (B...
-
Lower Sesan 2 Hydropower Dam: Brief
This dataset has no description
-
ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province
This document is a part of the report of Environmental and Social Impact Assessment (ESIA) for Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province developed by ...
-
Kamchay Dam: GPS Coordinate
Kamchay Hydroelectric Development Project was contracted for 44 years including 4 years of construction by Sinohydro Kamchay Hydroelectric Co,Ltd. The construction was planned t...
-
Concession bibliography
The concession biography is compiled by the land and livelihood program of NGO Forum on Cambodia. A list of the publications and laws extends over various issues of (economic la...
-
Cambodia inaugurates 193-MW Kamchay Hydropower project
This is a screenshot of the news published on Hydroworld website about KamChay Hydropower plan inauguration. The Chinese-built Kamchay dam project in Kampot province has a large...
-
-
Profiles of 12 Proposed Mainstream Developments in the LMB
This is a PowerPoint Presentation of SEA Team on Profiles of 12 Proposed Mainstream Developments in the LMB during the Regional Impacts Assessment Workshop in Vientiane, 2010. T...
-
PM Opens Kampot Hydrodam
The Chinese-built Kamchay dam project is located in Kampot province with a large production capacity of 193.2MW and total cost of 280 million US dollars has inaugurated by prim...
-
Rapid Assessment of Prey Lang Forest
This report was prepared by Aruna Technology Lt d. (“Aruna”, the Consultant) for the East-West Management Institute (EWMI) as the final output for a contract to conduct a rapid...
-
Stung Cheay Areng Hydropower Dam: Brief
This brief summary about Stung Cheay Areng Hydropower dam by the Earthrights International outlines the general overview, involvement of the Chinese companies in the project, i...
-
Opposition to proposed Stung Cheay Areng Dam
The site for proposed 260-MW Stung Cheay Areng Dam is located in Central Cardamom Protected Forest. China-based Sinohydro Resources is contracted by the Cambodian government for...
-
6th China-built hydropower dam in Cambodia starts operation
After more than 4 years of construction, Tatay (River) hydropower plant's one of the three generators begun operation with a capacity of 82 megawatts. The plant in Koh Kong prov...
-
Lower Sesan II hydropower project
The Lower Sesan 2 (LS2) hydropower project has installed capacity of 400MW, with a height of 75 meters and length of 6 kilometers. It will be implemented in Sesan district, Stu...